8tracks – Rewiring the Megastructure

- BEGIN TRANSMISSION -
REQUEST: hard-wiring of telecommunication infrastructure
         in local sectors 53.A, 53.C, 53.D.
CAUSE: recent class III cataclysmic failure.
ATTACHED: 14 encoded audio carriers of nominal data
          for heuristic development.
- END TRANSMISSION -

 

 

Including tracks by:

Posted on May 7, 2011 at 11:26 am by eli · Permalink
In: Uncategorized · Tagged with: , , ,